A US engineering firm owner told us last week he didn’t need help with pricing. His business is booked out for two years, and he compares his rates against the competition all the time.
It’s a reasonable answer. It’s also the answer most likely to hide a margin problem, because a full order book is where pricing risk sits unnoticed for longest. Here is why, and what the latest manufacturing data says about it.
Costs are still rising. Order books are still growing.
October’s ISM Manufacturing PMI report put the Prices Index at 75.2. That eased from 77.9 in September, but any reading above 50 means more manufacturers are paying higher input prices than lower ones. Tariffs feature in respondents’ comments among the pressures.
The Backlog of Orders index was 54.6. It also eased, from 56.4, but it remains above 50. On balance, order books are still growing.
Manufacturers’ own expectations point the same way. In the National Association of Manufacturers’ Q2 2026 survey, firms expected their input costs to rise 5.81% over the next year, and their own prices only 4.17%.
Why a long backlog is a pricing exposure
Work in a backlog was priced on the day it was booked. It gets built with materials bought weeks or months later. Between those two dates, every rise in input costs comes straight out of margin.
Nobody discounted anything. No customer pushed back. The margin went in the gap between when the price was set and when the costs arrived.
The longer the backlog, the wider that gap. A business booked out for two years is carrying two years of cost risk at prices set before most of it was known. A strong order book is a sign of demand. On fixed terms, it is also a long bet that costs will sit still.
The usual fix, the next annual increase, rarely closes the gap. Simon-Kucher’s 2025 global pricing study found companies realise, on average, only 43% of the price increases they plan.
What booked-out manufacturers can do
A full order book is also the strongest pricing position a manufacturer will have. Customers waiting for your capacity are rarely shopping on price. A few ways to use that position:
- Shorten quote validity. A 30-day quote in a market where metals move monthly is a smaller bet than a 90-day one.
- Link price to an index on long jobs. Almost one in three firms in the Richmond Fed’s September 2026 survey use inflation-linked or index-based pricing. On work that will be built a year out, a clause tied to a published materials index shares the risk instead of absorbing it.
- Price new work for the costs it will meet. If a job won’t start for nine months, the quote should reflect where costs are likely to be then, not where they are today.
- Charge for capacity. Guaranteed slots, shorter lead times and priority scheduling are worth something when you are booked out. They are easy to give away without a price.
Three questions to ask of your order book
- When was the work in your backlog priced?
- What have your input costs done since?
- Do your contracts let you recover any of it?
If the answers are “a while ago”, “gone up” and “no”, the backlog isn’t the comfort it looks like. It’s the place to start.
Define the next step. If your order book is full and you want to know what it is really earning, book a conversation on any of the links on the site.
Sources
- Institute for Supply Management, Manufacturing PMI Report, October 2026 (as reported by Supply Chain Dive)
- National Association of Manufacturers, Manufacturers’ Outlook Survey, Q2 2026
- Simon-Kucher, Global Pricing Study, 2025
- Federal Reserve Bank of Richmond, firm survey, September 2026